Ketvirtadienis, gruodžio 25 d.

Šveicarija – Su mokymu ir moksliniais tyrimais susijusių pastatų statybos darbai – BKP 242 Heizungsanlagen / 246 Kälte | Aufstockung Turnhallen TBS5, Weinfelden

Šveicarija – Su mokymu ir moksliniais tyrimais susijusių pastatų statybos darbai – BKP 242 Heizungsanlagen / 246 Kälte | Aufstockung Turnhallen TBS5, Weinfelden


I dalis: Perkančioji organizacija

    I.1) Pavadinimas ir adresai:

      Oficialus pavadinimas: Sekundarschulgemeinde Weinfelden (MLR Baumanagement GmbH)
      Adresas: Freiestrasse 5
      Miestas: Weinfelden
      Pašto kodas: 8570
      Šalis: Šveicarija
      Asmuo ryšiams:
      El-paštas: r.gubser@schuleweinfelden.ch
      Interneto adresas (-ai):
      Pagrindinis adresas: https://www.sekweinfelden.ch

II dalis: Objektas

    II.1.1) Pavadinimas:

      BKP 242 Heating Systems / 246 Refrigeration System | Vertical extension of Gymnasiums TBS5, Weinfelden

    II.1.2) Pagrindinis BVPŽ kodas:

      45214000 Su mokymu ir moksliniais tyrimais susijusių pastatų statybos darbai

    II.1.3) Sutarties tipas:

      Kita

    II.1.4) Trumpas aprašymas:

      Subject of the Contract: As part of the project, the existing gymnasium will be extended by adding two additional floors for use as a secondary school. The extension will be constructed using timber element construction. The new/extended staircases will be built as double-shell structures in exposed concrete. The two-story extension will include 12 classrooms (one of which will be equipped as a learning space), 7 group rooms, and two staff rooms with a terrace. At the heart of the school, a single-story atrium (open to the outside climate) is designed. Special Conditions: The renovation will take place predominantly during ongoing operations. A complete closure of the gymnasium is only planned for the duration of the timber construction work for the extension Heating: The existing woodchip heating system of the school has sufficient capacity to cover the extension as well. Heat distribution will be provided via underfloor heating. Through a changeover switch in the technical center, slight cooling can also be achieved via the underfloor heating. A heating/cooling coil in the ventilation unit allows the supply air to be heated in winter and slightly cooled in summer. The extension will include a substation on the 2nd floor, which will be connected to the main line in the technical center located in the basement of the gymnasium, requiring minor adjustment work. Cooling: Two chillers will be installed in cascade on the new flat roof, enabling the new rooms to be slightly cooled via the underfloor heating and the ventilation system.

II.2) Aprašymas:

    II.2.1) Kitas (-i) šio pirkimo BVPŽ kodas (-ai):

      45214000 Su mokymu ir moksliniais tyrimais susijusių pastatų statybos darbai
Svetainė yra atnaujinama. Galimi smulkūs nesklandumai.