Šveicarija – Su mokymu ir moksliniais tyrimais susijusių pastatų statybos darbai – BKP 242 Heizungsanlagen / 246 Kälte | Aufstockung Turnhallen TBS5, Weinfelden
Šveicarija – Su mokymu ir moksliniais tyrimais susijusių pastatų statybos darbai – BKP 242 Heizungsanlagen / 246 Kälte | Aufstockung Turnhallen TBS5, Weinfelden
I dalis: Perkančioji organizacija
I.1) Pavadinimas ir adresai:
Oficialus
pavadinimas: Sekundarschulgemeinde Weinfelden (MLR Baumanagement GmbH)
Adresas: Freiestrasse 5
Miestas: Weinfelden
Pašto
kodas: 8570
Šalis: Šveicarija
Asmuo
ryšiams:
El-paštas: r.gubser@schuleweinfelden.ch
Interneto adresas (-ai):
Pagrindinis adresas: https://www.sekweinfelden.ch
II dalis: Objektas
II.1.1) Pavadinimas:
BKP 242 Heating Systems / 246 Refrigeration System | Vertical extension of Gymnasiums TBS5, Weinfelden
II.1.2) Pagrindinis BVPŽ kodas:
45214000
Su mokymu ir moksliniais tyrimais susijusių pastatų statybos darbai
II.1.3) Sutarties tipas:
Kita
II.1.4) Trumpas aprašymas:
Subject of the Contract:
As part of the project, the existing gymnasium will be extended by adding two additional floors for use as a secondary school. The extension will be constructed using timber element construction. The new/extended staircases will be built as double-shell structures in exposed concrete.
The two-story extension will include 12 classrooms (one of which will be equipped as a learning space), 7 group rooms, and two staff rooms with a terrace. At the heart of the school, a single-story atrium (open to the outside climate) is designed.
Special Conditions:
The renovation will take place predominantly during ongoing operations. A complete closure of the gymnasium is only planned for the duration of the timber construction work for the extension
Heating: The existing woodchip heating system of the school has sufficient capacity to cover the extension as well. Heat distribution will be provided via underfloor heating. Through a changeover switch in the technical center, slight cooling can also be achieved via the underfloor heating. A heating/cooling coil in the ventilation unit allows the supply air to be heated in winter and slightly cooled in summer.
The extension will include a substation on the 2nd floor, which will be connected to the main line in the technical center located in the basement of the gymnasium, requiring minor adjustment work.
Cooling: Two chillers will be installed in cascade on the new flat roof, enabling the new rooms to be slightly cooled via the underfloor heating and the ventilation system.
II.2) Aprašymas:
II.2.1) Kitas (-i) šio pirkimo BVPŽ kodas (-ai):
45214000 Su mokymu ir moksliniais tyrimais susijusių pastatų statybos darbai