Norvegija – Mokslinių tyrimų ir taikomosios veiklos paslaugos bei su jomis susijusios konsultacinės paslaugos – Full scale tests of the zero ventilation principle.

Norvegija – Mokslinių tyrimų ir taikomosios veiklos paslaugos bei su jomis susijusios konsultacinės paslaugos – Full scale tests of the zero ventilation principle.


I dalis: Perkančioji organizacija

    I.1) Pavadinimas ir adresai:

      Oficialus pavadinimas: Statens vegvesen
      Adresas: Skoggata 19
      Miestas: Moss
      Pašto kodas: 1500
      Šalis: Norvegija
      Asmuo ryšiams:
      El-paštas: anders.stedding.kristiansen@vegvesen.no
      Interneto adresas (-ai):
      Pagrindinis adresas: https://www.vegvesen.no

II dalis: Objektas

    II.1.1) Pavadinimas:

      Full scale tests of the zero ventilation principle.
      Nuorodos numeris: 24/319455

    II.1.2) Pagrindinis BVPŽ kodas:

      73000000 Mokslinių tyrimų ir taikomosios veiklos paslaugos bei su jomis susijusios konsultacinės paslaugos

    II.1.3) Sutarties tipas:

      Kita

    II.1.4) Trumpas aprašymas:

      Brief description: Several tunnel projects have recently proposed a ventilation principle with zero ventilation, i.e. that the ventilation speed is regulated down to 0 m/s in the tunnel to limit smoke dispersion in the tunnel. The principle is simulated and assessed in several studies, but the conclusions from the articles are sprawling. No physical tests have been seen on the principle on a large scale. The Norwegian Public Roads Administration c/o the Authority and Regulations would therefore like more knowledge about the principle and the consequences this management can have. The assignment comprises a preliminary project as a basis for assessing the ventilation principle in road tunnels, as well as an option for testing the ventilation principle with a full-scale fire trial in the Runehamar Tunnel. Extent: Preliminary project including literature review and proposals for the testing regime: <500 000 NOK Full-scale tests: NOK 3 million. Total extent: NOK 3.5 million Execution time: The preliminary project, including the test plan, must be completed by the end of March 2025. Any fire tests can be carried out in the Runehamar tunnel in May 2025. The delivery of the preliminary project must be adapted to take this into account. The reporting shall be completed by September 2025. The aim of the test project is to gain better knowledge on the zero ventilation principle. Both with a view to regulating possibilities for achieving the desired ventilation speed, and how conditions develop near the fire site at very low ventilation speeds. It may also be relevant to look at higher ventilation speeds for comparison, as well as influence on turning the ventilation direction outwards in the fire process. The Norwegian Public Roads Administration intends to enter into a direct contract with Rise Fire Research AS (Org. no. 982 930 057) after the expiry of this intention notice and at the latest 15. January 2025.

II.2) Aprašymas:

    II.2.1) Kitas (-i) šio pirkimo BVPŽ kodas (-ai):

      73000000 Mokslinių tyrimų ir taikomosios veiklos paslaugos bei su jomis susijusios konsultacinės paslaugos
Svetainė yra atnaujinama. Galimi smulkūs nesklandumai.