Airija – Architektūros, inžinerijos ir planavimo paslaugos – Architektas arba inžinierius Vadovavo projektavimo grupei, kuri rengė 10 akrų teritorijos generalinį planą ir planavo pramoninį pagrindinį pastatą Lisheen, Co. Tipperary

Airija – Architektūros, inžinerijos ir planavimo paslaugos – Architektas arba inžinierius Vadovavo projektavimo grupei, kuri rengė 10 akrų teritorijos generalinį planą ir planavo pramoninį pagrindinį pastatą Lisheen, Co. Tipperary


I dalis: Perkančioji organizacija

    I.1) Pavadinimas ir adresai:

      Oficialus pavadinimas: Tipperary County Council
      Adresas: Civic Offices Clonmel, Civic Offices Nenagh
      Miestas: Clonmel, Nenagh
      Pašto kodas: E91N512 E45A099
      Šalis: Airija
      Asmuo ryšiams:
      El-paštas: secretary@tipperarycoco.ie
      Interneto adresas (-ai):
      Pagrindinis adresas: https://www.tipperarycoco.ie

II dalis: Objektas

    II.1.1) Pavadinimas:

      Architect or Engineer Led Design Team for Masterplan of a 10-acre site and Planning for Industrial Core building at Lisheen, Co. Tipperary

    II.1.2) Pagrindinis BVPŽ kodas:

      71240000 Architektūros, inžinerijos ir tyrinėjimo paslaugos

    II.1.3) Sutarties tipas:

      Kita

    II.1.4) Trumpas aprašymas:

      Architect or Engineer Led Integrated Multidisciplinary Design Team Consultancy Services for the development of a Masterplan Development of a 10-acre site at Lisheen, Co. Tipperary and Part 8 Planning for Industrial Core building. Scope of Service Assemble and lead an integrated Design Team for the development of a Masterplan of a c.10-acre site at Lisheen, Co. Tipperary and Part 8 Planning for Industrial Core building. The commission is to conclude at A defined Masterplan for the 10 acre site A Part 8 planning application for a circa. 300m2 industrial core building Confirmation of Feasibility and Connection agreements, with Utility Providers to service the 10acre site and the ancillary building e.g. ESB, Uisce Eireann, Bord Gais, Broadband, etc. Detailed design of wastewater treatment system Stage 5 detailed design of a piece of site infrastructure works, subject to approval. Architect (if Civil Engineer Lead Applicant) Civil and Structural Engineer (if Architect Lead Applicant) Geotechnical/Geophysical Engineer Quantity Surveying Project Supervisor for the Design Process (PSDP) Planning and Environmental Services Ecology Services Business Analyst Landscape Architect Sustainability consultant It is the responsibility of the lead discipline to enter into specific contracts with each of the sub-consultants. This means the lead discipline will manage and coordinate all sub-consultant engagements, ensuring they meet the project requirements and standards. The Lead consultant will therefore manage invoicing to other specialists and disciplines.

II.2) Aprašymas:

    II.2.1) Kitas (-i) šio pirkimo BVPŽ kodas (-ai):

      71240000 Architektūros, inžinerijos ir planavimo paslaugos
      71250000 Architektūros, inžinerijos ir tyrinėjimo paslaugos
Svetainė yra atnaujinama. Galimi smulkūs nesklandumai.