Egiptas – Visi ar daliniai statybos ir civilinės inžinerijos darbai – Construction of Zaghloul El Bahary Wastewater Treatment Plant (WWTP), Design – Build, Defect Liability Year, and Optional One (1) Year of Operation and Maintenance

Egiptas – Visi ar daliniai statybos ir civilinės inžinerijos darbai – Construction of Zaghloul El Bahary Wastewater Treatment Plant (WWTP), Design – Build, Defect Liability Year, and Optional One (1) Year of Operation and Maintenance


I dalis: Perkančioji organizacija

    I.1) Pavadinimas ir adresai:

      Oficialus pavadinimas: Kafr El-Sheikh Water Supply and Sanitation Company (KSWSSC), Project Implementation Unit (PIU)
      Adresas: El-Estaad El-Reiady St.
      Miestas: Kafr El-Sheikh City
      Pašto kodas: 000
      Šalis: Egiptas
      Asmuo ryšiams:
      El-paštas: kswep.piu@gmail.com
      Interneto adresas (-ai):
      Pagrindinis adresas:

II dalis: Objektas

    II.1.1) Pavadinimas:

      Construction of Zaghloul El Bahary Wastewater Treatment Plant (WWTP), Design – Build, Defect Liability Year, and Optional One (1) Year of Operation and Maintenance
      Nuorodos numeris: EIB-GtP/KSWEP-P2-WT-01/H.M1.15

    II.1.2) Pagrindinis BVPŽ kodas:

      45200000 Visi ar daliniai statybos ir civilinės inžinerijos darbai

    II.1.3) Sutarties tipas:

      Kita

    II.1.4) Trumpas aprašymas:

      The work to be carried out under this works contract comprises the permanent works (facilities and systems) related to the new Zaghoul El Bahary WWTP (15,000 m3/d, 2037 expanded to 25,000 m3/d, 2052) in Motobas District, Kafr El Sheikh Governorate, to be designed, constructed, and commissioned; the effective restoration of any defects during the 1-year Defects Liability Period; and the optional 1-year of normal operation and maintenance of the works for the WWTP. The contract comprises also the provision of training services to the Procuring Entity’s personnel duly completed within the Defects Liability Period or the Optional 1 year Operation and Maintenance Period as the case may be, and before the works hand-over. Some minor works of the Plant has been executed by another Contractor in a previous phase. Although not part of the Works, the Contractor shall be aware of its obligations toward these Existing Works as defined in the Contract Documents.

II.2) Aprašymas:

    II.2.1) Kitas (-i) šio pirkimo BVPŽ kodas (-ai):

      45200000 Visi ar daliniai statybos ir civilinės inžinerijos darbai
Svetainė yra atnaujinama. Galimi smulkūs nesklandumai.