Norvegija – Dujinis kuras – Framework agreement for the delivery of biogas with the construction and operation of a filling station.
Norvegija – Dujinis kuras – Framework agreement for the delivery of biogas with the construction and operation of a filling station.
I dalis: Perkančioji organizacija
I.1) Pavadinimas ir adresai:
Oficialus
pavadinimas: RENOVASJONSSELSKAPET FOR DRAMMENSREGIONEN IKS
Adresas:
Miestas: Drammen
Pašto
kodas:
Šalis: Norvegija
Asmuo
ryšiams:
El-paštas: peter.gjefle@rfd.no
Interneto adresas (-ai):
II dalis: Objektas
II.1.1) Pavadinimas:
Framework agreement for the delivery of biogas with the construction and operation of a filling station.
Nuorodos numeris: RfD - 010
II.1.2) Pagrindinis BVPŽ kodas:
09120000
Dujinis kuras
II.1.3) Sutarties tipas:
Kita
II.1.4) Trumpas aprašymas:
The contracting authority shall enter into a framework agreement with one tenderer. This supplier shall build and operate a filling station on our site for the delivery of compressed biogas (CBG), which shall be used exclusively by the Contracting Authority's refuse collection vehicles. The procurement includes the following main points: 1 Delivery of compressed biogas: The tenderer shall ensure continual supply of biogas in accordance with the contracting authority ́s needs. The biogas shall be transported and stored using flakes that the tenderer owns and maintains.2 Establishment of a filling station: The tenderer shall build a filling station facility. Quick filling (solid-fill) via compressor and dispenser. Slow filling (slow-fill) with parking places for refuse collection vehicles. Infrastructure for safe storage and handling of flakes with biogas shall be established.3 Operation and maintenance: The tenderer is responsible for the operation, maintenance and insurance of the plant for the entire contract period. Service agreements shall be signed to ensure continual functionality and security. At the end of the contract, the plant shall be transferred free of charge to the contracting authority, with a registered mortgage right that ensures the contracting authority's ownership.4 Exclusive use: The installation shall only be used by the contracting authority, and it is not allowed to sell biogas to private or other actors.5 Security requirements: The installation must be in accordance with the current regulations, including ATEX directives and Norsk Gassnorm.Security distances, risk handling and technical barriers shall be implemented based on previous. risk assessments. It is the requirement specification that applies, the extract above is only meant as an introduction.
II.2) Aprašymas:
II.2.1) Kitas (-i) šio pirkimo BVPŽ kodas (-ai):
09120000 Dujinis kuras